Tags: Japan | Nuclear | Fukushima

Fukushima Nuclear Plant Operator: Seismometers Were Broken

Fukushima Nuclear Plant Operator: Seismometers Were Broken

Monday, 22 February 2021 11:01 AM EST

TOKYO (AP) — The operator of the wrecked Fukushima nuclear power plant said Monday that two seismometers at one of its three melted reactors have been out of order since last year and did not collect data when a powerful earthquake struck the area earlier this month.

The acknowledgement raised new questions about whether the company's risk management has improved since a massive earthquake and tsunami in 2011 destroyed much of the plant.

The malfunctioning seismometers surfaced during a Nuclear Regulation Authority meeting on Monday to discuss new damage at the plant resulting from a magnitude 7.3 quake that struck the region on Feb. 13. Cooling water and pressure levels fell in the Unit 1 and 3 reactors, indicating additional damage to their primary containment chambers.

The operator, Tokyo Electric Power Co., has repeatedly been criticized for coverups and delayed disclosures of problems at the plant.

Regulatory officials asked TEPCO at the meeting why it did not have seismological data from the Unit 3 reactor for Saturday's quake, and utility officials acknowledged that both of its seismometers had failed — one in July and the other in October — and had never been repaired.

TEPCO also said that seismometers at all but two of the reactor buildings that survived the 2011 disaster were submerged by water from the tsunami and have never been replaced.

During Monday's meeting, regulatory officials said they were concerned about the declining water levels and pressure in the Unit 1 and 3 primary containment chambers because of the possibility that the quake had expanded the existing damage or opened new leakage paths, and urged the utility to closely check for any increased radiation levels in the ground water surrounding the reactor buildings.

TEPCO said no abnormality has been detected in water samples so far.

New damage could further complicate the plant's already difficult decommissioning process and add to the large amounts of contaminated water being stored at the plant.

Since the 2011 disaster, cooling water has been escaping constantly from the damaged primary containment vessels into the basements of reactor and turbine buildings, where the volume increases as groundwater seeps in. The water is pumped up and treated, then part of it is reused as cooling water, while the rest is stored in about 1,000 tanks.

TEPCO initially reported there was no abnormality at the plant from Saturday's earthquake. But on Monday, it said about 20 of the tanks had slid slightly due to the quake, a storage container carrying radioactive waste had tilted, and asphalt pavement at the plant was cracked.

© Copyright 2024 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.


GlobalTalk
The operator of the wrecked Fukushima nuclear power plant said Monday that two seismometers at one of its three melted reactors have been out of order since last year and did not collect data when a powerful earthquake struck the area earlier this month.The acknowledgement...
Japan,Nuclear,Fukushima
423
2021-01-22
Monday, 22 February 2021 11:01 AM
Newsmax Media, Inc.

Sign up for Newsmax’s Daily Newsletter

Receive breaking news and original analysis - sent right to your inbox.

(Optional for Local News)
Privacy: We never share your email address.
Join the Newsmax Community
Read and Post Comments
Please review Community Guidelines before posting a comment.
 
 
TOP

Newsmax, Moneynews, Newsmax Health, and Independent. American. are registered trademarks of Newsmax Media, Inc. Newsmax TV, and Newsmax World are trademarks of Newsmax Media, Inc.

NEWSMAX.COM
© Newsmax Media, Inc.
All Rights Reserved
NEWSMAX.COM
© Newsmax Media, Inc.
All Rights Reserved