Tags: APFN | EU | Europe | Jet Engine Inspections

European Regulators Tighten Order for Jet Fan Blade Tests

European Regulators Tighten Order for Jet Fan Blade Tests

Saturday, 21 April 2018 05:38 AM

BERLIN (AP) — The European Aviation Safety Agency has tightened a nearly month-old directive ordering inspections of some fan blades in engines like those used on a Southwest Airlines jet involved in a fatal accident.

A directive published by EASA late Friday called for inspections within 20 days of blades in the oldest CFM56-7B engines — those that have been through 30,000 engine cycles or more since installation. Newer blades will have to be inspected within 133 days, and the inspections repeated within 3,000 cycles.

A March 26 directive called for ultrasonic inspections within nine months. The updated instructions cited a "further failure" of a CFM56-7B fan blade.

A fan blade snapped off mid-flight on a Southwest Airlines flight Tuesday, causing an engine to explode in an accident that fatally injured a passenger.

© Copyright 2019 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

   
1Like our page
2Share
GlobalTalk
The European Aviation Safety Agency has tightened a nearly month-old directive ordering inspections of some fan blades in engines like those used on a Southwest Airlines jet involved in a fatal accident.A directive published by EASA late Friday called for inspections within...
APFN,EU,Europe,Jet Engine Inspections
131
2018-38-21
Saturday, 21 April 2018 05:38 AM
Newsmax Media, Inc.
 
 

Newsmax, Moneynews, Newsmax Health, and Independent. American. are registered trademarks of Newsmax Media, Inc. Newsmax TV, and Newsmax World are trademarks of Newsmax Media, Inc.

NEWSMAX.COM
© Newsmax Media, Inc.
All Rights Reserved