Maduro: Gunshot Caused Venezuela Power Outage

Wednesday, 18 Dec 2013 09:03 AM

 

Share:
  Comment  |
   Contact Us  |
  Print  
|  A   A  
  Copy Shortlink

CARACAS, Venezuela — President Nicolas Maduro said Tuesday that saboteurs used a gun to bring down a power cable and plunge more than half of Venezuela into darkness earlier this month.

As well as causing chaos on the streets, the Dec. 2 blackout sparked an immediate blame game. The government accused right-wing foes of an attack, while opponents said the outage was due to incompetent management of the electric grid.

"They attacked a transmission line," Maduro said in a speech to a regional summit in Caracas, attended by several heads of state. "The sabotage has been proven. With a gun shot, they split a key line and left the country in the dark."

Since winning a vote to replace late leader Hugo Chavez, the 51-year-old former bus driver has made a plethora of accusations against his foes, ranging from economic sabotage to death plots against him and Socialist Party No. 2 Diosdado Cabello.

Critics, including opposition leader Henrique Capriles, have mocked those as lies designed to distract Venezuelans from day-to-day problems like stuttering public services.

Maduro's intelligence chief, Miguel Rodriguez, also had suggested that a gunman brought down the 765-megawatt electricity cable in the Venezuelan savannah that connects about two-thirds of the nation to the country's largest dam.

It was the second such outage there in three months.

"A good marksman can hit a three-centimeter cable from 50 meters. It's very easy," said Rodriguez, who is also interior minister and is helping lead the investigation into the power cut. "It was a clean cut."

Venezuela, an OPEC nation with the world's biggest oil reserves and a population of 29 million, has been suffering periodic electricity cuts since 2009, especially outside the capital Caracas.

Maduro blames sabotage and wasteful use of electricity by Venezuelans but critics say the power failures are symptomatic of lack of investment and mismanagement within state power company Corpoelec since Chavez's 2007 takeover of the sector.

Venezuela has a maximum generation capacity of about 28,000 megawatts and normal demand of about 18,000.

© 2014 Thomson/Reuters. All rights reserved.

Share:
  Comment  |
   Contact Us  |
  Print  
  Copy Shortlink
Around the Web
Join the Newsmax Community
Please review Community Guidelines before posting a comment.
>> Register to share your comments with the community.
>> Login if you are already a member.
blog comments powered by Disqus
 
Email:
Country
Zip Code:
Privacy: We never share your email.
 
Hot Topics
Follow Newsmax
Like us
on Facebook
Follow us
on Twitter
Add us
on Google Plus
Around the Web
Top Stories
You May Also Like

Oil Price Fall Challenges US Shale Boom

Sunday, 23 Nov 2014 10:16 AM

The US shale boom, which has challenged the rules of the global petroleum market, could soon face its own day of reckoni . . .

Yale University Students Win Most Rhodes Scholarships With Four

Sunday, 23 Nov 2014 08:44 AM

Yale University students were the most successful in winning Rhodes Scholarships this year, taking home four of the 32 a . . .

FARC to Free Colombian General, Others Next Week: President

Saturday, 22 Nov 2014 11:05 AM

FARC guerrillas who captured a Colombian general and four other people will release the prisoners next week, president J . . .

Most Commented

Newsmax, Moneynews, Newsmax Health, and Independent. American. are registered trademarks of Newsmax Media, Inc. Newsmax TV, and Newsmax World are trademarks of Newsmax Media, Inc.

 
NEWSMAX.COM
America's News Page
©  Newsmax Media, Inc.
All Rights Reserved